Paulins Kill Viaduct |
The old route out of Portland has held up pretty well over the years. The start controle, once a diner, then a bagel shop, is now a Dunkin'. Nevertheless, some issues on the course needed to be addressed. The cuesheets and RWGPS route have been updated with detours and important safety notes. Make sure you have at least version 3 of the cues, and GPS route updated on or after 26 August 13:17 EDT.
Note that parking at the start of the ride in not at the Dunkin' Donuts. Rather, please park at the Portand Park-N-Ride lot just south of the toll plaza and the railroad tracks crossing River Rd. Speaking of those tracks, you'll likely cross them three times: too and from the Dunkin' and then after the finish. They are angled a bit, and might be slippery, so be careful when you cross them.
The finish of the ride is at Theresa's Pizza. This is not where your car is parked. There is a very short, all downhill coast back to your car at the Park-N-Ride.
Organizer Chris Nadovich conducted a course check-out pre-ride on August 24th. Here are some course notes:
I lucked out for my pre-ride. It was ideal weather: high 50s at the start moving to low 70s by mid-day. I hope the day of event has equally nice weather so everyone can appreciate this beautiful course.
There was very little of concern on the course, roadway wise. Most of the pavement was in good to excellent condition. Mind the railroad tracks near the start/finish. Stay alert for the occasional gravel patch, pothole or storm grate, and take care riding on or crossing busy roads. Otherwise, enjoy the ride.
mile 40.8 -- Originally, Bridge St bagel was listed as the controle stop in Milford, and this is an excellent place for breakfast. Unfortunately, later in the day I found it quite busy. When I was there (10 AM) the line was out the door. To mitigate against this problem, the Milford controle is now listed as an open controle. If the bagel shop is too busy, good alternatives are the Milford Market and the Citgo.
mile 70.7 -- This Shell station is the last controle with services sure to be available. Please replenish here, as there are slim pickens for the next 45 miles. The RDJ deli at this Shell makes a decent sandwich. When I arrived there was only one person minding the store (the woman owner who's kids are named R, D, and J). She was very nice. I had no trouble getting my order quickly, there were few customers, but be sensitive to the possibility of delay if the place is busy.
mile 95 -- Slower riders may not reach the Millside Cafe (mi 95) before the kitchen closes (3PM). And the Geo. D. Garris General Store in Stillwater (mi 109) closed years ago. If you're desperate for provisions and Millside is closed, there are services in either direction on Rt 15 about a mile off course. Also, if Millside is closed so you can't get a signature for your card, please answer the info question.
mile 115 -- The Rt 94 bridge in Blairstown is still under construction. There was only one lane open and a traffic light meters one-way traffic through in alternating directions. Instead of waiting your turn and braving the highway traffic, the cues have been revised to take you over the Paulins Kill via the Footbridge in "Footbridge Park". It adds a little distance but is a much more pleasant way to cross the creek. Note too that the Paulins Kill is the same creek crossed by the Paulins Kill Viaduct (121.2), and you will re-cross the Paulins Kill on the Station Rd bridge (121.6).
Entrance to Footbridge Park in Blairstown |
No comments:
Post a Comment